资料介绍:
If the tool compensation amount is changed during automatic operation (including
single block stop), the amount will be validated from the next block or several blocks
following.
If the workpiece coordinate offset amount is changed during single block stop, the
changes will be valid from the next block.
Pay close attention to the sequence operation when carrying out forced data setting
(forced output) in the PLC I/F (diagnosis) screen.
If the operation start position is set from a block in the program and the program is
started, the program before the set block is not executed. If there are coordinate
system shift commands or M, S, T, and B commands before the block set as the
starting position, carry out the required commands using the MDI, etc. There is a
danger of interference with the machine if the operation is started from the set starting
position block without carrying out these operations.
To prevent the influence of data loss and data transformation over the line, always
carry out data comparison after transferring a machining program.
Do not change the setup parameters without prior consent from the machine